High temperature resistant Pe-rt heating pipe

Short Description:

(1) Before laying the floor heating pipes, it is necessary to make a good design, look at the amount of indoor pipes, and have a calculation. The amount of each aspect must be designed in advance. It is also very convenient to calculate and plan the piping diagram according to the indoor area. Later, the construction can be carried out according to the drawing.

(2) According to the determined position and marked height at home, the manifold should be flat and firmly attached to the wall, and fixed with expansion bolts. In order to prevent heat loss, it is necessary to cover the pipe from the manifold to the installation room with a special insulation jacket.


Product Detail

Product Tags

How to lay the floor heating pipe:

(1) Before laying the floor heating pipes, it is necessary to make a good design, look at the amount of indoor pipes, and have a calculation. The amount of each aspect must be designed in advance. It is also very convenient to calculate and plan the piping diagram according to the indoor area. Later, the construction can be carried out according to the drawing.

(2) According to the determined position and marked height at home, the manifold should be flat and firmly attached to the wall, and fixed with expansion bolts. In order to prevent heat loss, it is necessary to cover the pipe from the manifold to the installation room with a special insulation jacket.

(3) Before starting to spread the floor heating, sweep the dust on the floor of the house. If there are bumps or debris on the ground, clean up to ensure that the ground is level. Then, you need to conduct a field inspection of the entire home to make sure The installation location of the wall-hung boiler and the manifold.

(4) Use the hot water pipe as the main water pipe of the floor heating, and the temperature control line is buried in the place of the manifold, and some related temperature control lines are also placed around to facilitate the connection. The installation should be straight and tidy.

(5) At bends, the floor heating pipe must be protected. After all, the pipe is relatively hard. Although it is a coiled pipe, the degree of bending is still limited. It is necessary to protect the bend of the floor heating pipe when laying it.

2. What to do if the floor heating pipeline leaks:

(1) First, turn off the heating valve, then turn off the pipeline valves in the water leakage area, open the exhaust valve, and exhaust the exhaust gas.

(2) Next, perform a pressure test to determine where the leak is.

(3) Finally, ask professional maintenance personnel to pry open the floor for maintenance. If you do not know the pressure test, you can ask the floor heating company to detect the leak.

(4) In fact, installing the floor heating is not a temporary work forever. After three or five years of use, it needs to be cleaned and oxidized, so that water leakage is not easy to occur, and the heating effect can be improved. And if the floor heating system is not cleaned for a long time, it will reduce the service life, so you should regularly ask a professional cleaning company to clean it.

products
SELF ADHESIVE VINYL5
SELF ADHESIVE VINYL5
SELF ADHESIVE VINYL5
SELF ADHESIVE VINYL5

  • Previous:
  • Next:

  • Write your message here and send it to us